Search Icon
Made In USA

Home » Products » Stairs & Work Platforms » Concrete Form Kit

Concrete Form Kit for Stair Landings & Tower Foundations

Perfect for Remote Locations

A prefabricated, surface-mount form kit that turns any flat surface — including rooftops — into a code-ready foundation for ErectaStep stairs and towers. Just add concrete.

  • 10-minute assembly – unbox to ready-to-pour
  • No digging, no permits – surface-mountable on concrete, asphalt, or rooftop
  • Non-penetrating – safe for roof membranes (roof tray sold separately)
  • OSHA-compliant – meets structural stability requirements for stair landings
  • In stock – flat-packed and ready to ship from the U.S.
Kenny Rogers Avatar
Concrete Form Kit
SafeRack F1-F2 Concrete Form Kit Sheet SR Info
SafeRack F1-F2 Concrete Form Kit Sheet SR Info
ErectaStep Crossover Stairs with F1 form kit footer

Instant concrete form kits that are convenient and include everything needed for stair landing pads and tower foundations. Just add concrete.

Who It’s For

  • Maintenance & Facilities teams needing fast, compliant access without a civil crew
  • EPCs and project managers speccing landings for modular ErectaStep stairs and towers
  • Rooftop and remote-site installs where digging isn’t practical or permitted
  • Safety leaders upgrading temporary or non-compliant stair setups to OSHA standards

Why Choose the ErectaStep Form Kit

  • Faster than site-built forms. No lumber, no custom carpentry, no rework.
  • Lower total cost. Skip excavation, dig permits, and shop-fabricated pads.
  • Rooftop-ready. Non-penetrating design protects membranes and warranties.
  • Engineered to match. Purpose-built for ErectaStep’s modular stair system — no shimming, no adapters.
  • Backed by a RAM. Your Regional Area Manager helps you spec the right kit, quantity, and configuration for the job.

Concrete Form Kit

Specifications

How It Works (3 steps)

  • Unbox and assemble the form kit on your prepared surface — in under 10 minutes with 3 hand tools: an impact driver, a rubber mallet, and pliers.
  • Pour concrete into the form using the included anchor bolt layout.
  • Bolt on your ErectaStep stair or tower once the pad cures. Landing height is pre-matched to the 9″ tread rise.
SpecDetail
Finish height9″ (matches ErectaStep standard tread rise)
Live load50 psf
Snow load20 psf
Wind loadUp to 115 mph
CompatibilityStable up to ErectaStep’s 6-step configuration
InstallationSurface-mount, zero penetration
Weight with concreteF1 – ~1800lbs | F2 – ~785lbs
AnchorsIncluded
ManufacturedUnited States
AvailabilityIn stock, ready to ship
2′3′4′5′6′7′8′9′
18″
27″
36″
45″
54″
63″
72″
81″
90″
99″

Foundation will work for any configuration combination marked

2′3′4′5′6′7′8′9′
18″
27″
36″
45″
54″
63″
72″

Foundation will work for any configuration combination marked

F2 Specs

Resources & Specifications

Resources
SafeRack F1-F2 Concrete Form Kit Sheet SR Info
SCS Foundations Sheet
SCS PreCast Foundations Sheet
Specs & Manuals
ES F1-F2 Concrete Footer Form Kit Manual
Frequently Asked Questions
What is the ErectaStep Concrete Form Kit?

It’s a prefabricated, bolt-together form for pouring stair landing pads and tower foundations. Each kit ships flat with everything needed — including anchor bolts — so a crew can assemble the form, pour concrete, and be ready for stair installation the same day.

How long does it take to assemble?

Under 10 minutes with basic hand tools. The kit unboxes ready to place, level, and pour.

Do I need a permit or excavation?

No digging is required. Because the kit is surface-mounted and non-penetrating, most sites avoid dig permits entirely. Always confirm requirements with your local Authority Having Jurisdiction (AHJ).

Can I install the concrete form kits on a rooftop?

Yes. The zero-penetration design is rooftop-safe. Pair it with the optional rooftop tray (sold separately) to protect the roof membrane and warranty.

Is the Concrete Form Kit OSHA-compliant?

Yes. When installed per instructions, the pad meets OSHA structural stability requirements for stair landings. It’s engineered to support a 50 psf live load, 20 psf snow load, and wind up to 115 mph.

What stair heights and configurations does it support?

The finish height matches ErectaStep’s standard 9″ tread rise, and the kit is stable up to a 6-step ErectaStep configuration. For taller towers or custom builds, your Regional Area Manager (RAM) can confirm the right foundation solution.

How long before I can install the stairs after pouring?

Follow your concrete mix’s cure specification — typically 24–72 hours for foot traffic and 7 days for full design load. Your ready-mix supplier can confirm exact cure times for your climate and mix.

How fast can I get it? Is it in stock?

Yes. The Concrete Form Kit is manufactured in the United States, flat-packed, and stocked for immediate shipment. Most orders ship within 1–2 business days.

What Customers Are Saying

★★★★★

My salesperson was AMAZING I have nothing but good things to say about the service. It was outstanding. The sales rep responded to my inquiry immediately and answered every question I had it right away. I'm very pleased and impressed with the quality of customer service at SafeRack.

By Brian T. from Hawkins Chemical Inc.

★★★★★

Always a positive experience. Price is good. Outstanding delivery time. If it wasn't in stock for immediate delivery, I would have gone to another supplier. SafeRack had the item ready to go. My salesman John Nance is very efficient and responds almost immediately. This product improves safety for my staff, cutting down their time moving around the yard. This product is weather protected, with no maintenance, plus saves cost on designing, engineering and building in-house. Always a positive experience. Price is good.

By Jerry C. from Yellowline Asphalt Products Ltd

★★★★★

Second to none. Kenny Rogers was very responsive. I was very happy with the attention he gave to our order. SafeRack has a responsive crew working for them. Customer service was very accommodating. Sales was very professional, accommodating, quick to respond and knowledgeable about their product. Engineering was quick to respond to any changes we requested. Product quality, I would say, is second to none. We are very happy with the operation of the equipment. The lightweight design was the most attractive feature for us. The delivery of the majority of the order was either on time or delivered early. The product is very functional and easy to operate, these are the features that were most appealing to operations.

By Tim D. from Invista

★★★★

The product is simple, clean, and sturdy. The product is simple, clean, and sturdy. I would recommend the product and consider SafeRack again should a project require a loading dock system.

By Dorian M. from Murphy Oil USA

★★★★

Exactly what my customer needed. Sturdy material, lightweight, easy to handle. It was exactly what my customer needed, and this was easy to find on the website.

By Austin S. from Motion Industries Inc

★★★★★

My rep was very responsive and willing to solve tough problems to ensure I was satisfied. John Bast was very responsive, answered all my questions immediately. Engineering department had a tough time describing what they needed, once we worked through that issue everything went smooth.

By Thad A. from Martinez and Turek, Inc.