ErectaStep access platform installation at a Royal Mail package handling facility in England is helping keep the mail moving smoothly. This modular steel platform provides access to mail shoots, allowing operators to clear stuck packages efficiently.
Here’s a unique installation where our modular stair system is tightly integrated around the ammonia piping at a facility in Montana. Our standard stair units are highly configurable, and when applications demand tight tolerances or unusual layouts, our team can customize a solution to fit.
Secondary Spill Containment Access Stair Installation
Pig Launching and Receiving Platform Installation – 3-Days from Quote to Completion
ErectaStep stairs at an energy substation provide safe, compliant access for maintenance crews entering the secondary spill containment area to service diesel tanks in the tank farm.
ErectaStep stairs at an energy substation provide safe, compliant access for maintenance crews entering the secondary spill containment area to service diesel tanks in the tank farm.
SafeRack Rooftop Walkway Installation Using ErectaStep
PerfectaStep Maintenance Platform – Jacksonville Transit Authority.
An ErectaStep modular stair system installed at TC Energy’s LNG facility. Giving workers access to inspect and maintain a natural gas liquid separator or filter.
ErectaStep Modular Work Platforms Installed at a Major Petrochemical Facility, Replacing Temporary Scaffolding
Custom Metal Stair and Work Platform With Handrails
Elevator Shaft Electrical Room-Rooftop Installation in Myrtle Beach, SC



