ErectaStep access platform installation at a Royal Mail package handling facility in England is helping keep the mail moving smoothly. This modular steel platform provides access to mail shoots, allowing operators to clear stuck packages efficiently.
Barge gangway installation for a food supply chain agribusiness in Illinois
Here’s a unique installation where our modular stair system is tightly integrated around the ammonia piping at a facility in Montana. Our standard stair units are highly configurable, and when applications demand tight tolerances or unusual layouts, our team can customize a solution to fit.
MarinaStep SAS installed on a dock.
Secondary Spill Containment Access Stair Installation
Pig Launching and Receiving Platform Installation – 3-Days from Quote to Completion
ErectaStep stairs and platform at grain storage facility, giving safe access to fire suppression riser, manual control valves, and test/drain valves.
Mobile MarinaStep SAS Marine Gangway Installation: Shore-to-Barge Access
ErectaStep stairs at an energy substation provide safe, compliant access for maintenance crews entering the secondary spill containment area to service diesel tanks in the tank farm.
ErectaStep stairs at an energy substation provide safe, compliant access for maintenance crews entering the secondary spill containment area to service diesel tanks in the tank farm.
SafeRack’s ErectaRack prefabricated pipe rack installation in a beverage facility provides interior pipe routing to an air handling unit, eliminating delays from custom fabrication while ensuring seamless integration with existing facility infrastructure.
SafeRack’s ErectaRack prefabricated pipe rack installation at a beverage facility routes pipes from an exterior condenser through the facility to the interior air handler unit.



