A 15-foot SafeRack ErectaStep crossover spans an active rail spur at a phosphate and potash loading building, giving workers safe passage over spotted trains instead of walking between railcars.
Installed at this Canadian facility: SafeRack Loading Rack Platform, SafeRack Gangways, OPW Loading Arms with Vapor Recovery, Overfill Protection, and Grounding System — all engineered for safe, efficient railcar bulk diesel loading.
The Jacksonville Transit Authority required consistent, safe access to railcars for maintenance. SafeRack used ErectaStep components to create a maintenance platform that ensures maintenance crews can safely reach every car
SafeRack Railcar Loading Platform with Spill Containment Track Pan Installation
SafeRack Railcar Track Pan Installation for Transdev North America in West Palm Beach, Florida
3-Spot Railcar Loading Platform Installation in Progress with Spill Containment Track Pans.
Crude Oil Rail Car Loading Platform
Railcar Gangway Installation
SafeRack's Flat Ramp Telescoping Gangway installed at a railyard loading terminal with a two-rail safety cage to provide additional protection over the crash box.
Single canopy in use at a rail loading platform
Metal Safety Canopy for Rail provides weather protection and enhances worker safety.
SafeRack's Longest Rail Platform Installation in North America




