
SafeRack’s ErectaRack prefabricated pipe rack installation in a beverage facility provides interior pipe routing to an air handling unit, eliminating delays from custom fabrication while ensuring seamless integration with existing facility infrastructure.

SafeRack’s ErectaRack prefabricated pipe rack installation at a beverage facility routes pipes from an exterior condenser through the facility to the interior air handler unit.

Metal Railcar Loading and Unloading Platform with SafeRack Gangway and Safety Cages

A work platform is a great way to create extra space in a tight work area. By taking advantage of unused vertical space, work platforms make it possible to optimize work areas and create a safer work environment.

For ease of installation, ErectaStep’s pipe rack is pre-engineered and designed to be installed with bolted connections. This is a pipe rack being installed is a rail loading terminal

For ease of installation, ErectaStep’s pipe rack is pre-engineered and designed to be installed with bolted connections. This is a pipe rack being installed is a rail loading terminal

ErectaRack’s pre-engineered pipe racks significantly reduces the lengthy engineering and fabrication process typically required for pipe rack assembly by doing the engineering up-front.

Prefab pipe rack in a tank farm

ErectaRack Pipe Racks support over 2 miles of welded and galvanized pipes at Bukley’s Bulk Packaging facility in Texas. ErectaRack’s pre-engineered pipe racks significantly reduce the lengthy engineering and fabrication process typically required for pipe rack assembly by doing the engineering up-front.

ErectaRack’s Modular Pipe Racks install Faster and Easier than Custom Fabricated at a fraction of the time

ErectaRack Industrial Pipe Racks being installed on a loading terminal.

ErectaRack Pipe Racks support over 2 miles of welded and galvanized pipes at Buckley’s Bulk Packaging facility in Texas

Showcasing SafeRack’s innovative products and engineering, this is a newly installed 3-spot railcar unloading terminal in El Dorado, Kansas, featuring advanced tracking gangways for safe and efficient access to railcars. The project, completed in just four days, includes an elevated access structure with our ErectaRack system and is highlighted by the environmentally conscious Ultratech spill containment track pans and sump trench, ensuring both operational efficiency and environmental safety for a client specializing in high-quality automotive maintenance services.