
Custom Ladder Platform Improves Valve Access at Gulf Coast Petrochemical Facility

Installed at this Canadian facility: SafeRack Loading Rack Platform, SafeRack Gangways, OPW Loading Arms with Vapor Recovery, Overfill Protection, and Grounding System — all engineered for safe, efficient railcar bulk diesel loading.

8-Step Metal Stair Tank Farm Pipe Crossover

An ErectaStep modular stair system installed at TC Energy’s LNG facility. Giving workers access to inspect and maintain a natural gas liquid separator or filter.

ErectaStep Modular Work Platforms Installed at a Major Petrochemical Facility, Replacing Temporary Scaffolding

Custom Built Grounding Monitoring System

Getting access 8’ off the ground to control throughput.

Custom Metal Stair and Work Platform With Handrails

This is the final stages of an ErectaStep metal stair platforms at a terminal station at a location in the Permian Basin

This is the final stages of an ErectaStep metal stair platforms at a terminal station at a location in the Permian Basin

Pipelines are a perfect fit for ErectaStep!

A SafeRack track-mounted gangway that can be easily be adjusted and spotted over the truck hatch’s and is ideal for multi hatch truck loading.

Quick install with precast concrete pads

Jefferson energy refined products loading rack. Designed, manufactured and installed by SafeRack.

Ethanol railcar Loading and unloading rack platform at Jefferson Energy, Beaumont, Texas, TX

LPG Truck Loading Terminal with Hose Retrievers

Grounding Protection System for Truck Loading

Ground Protection System

Access platform installation for accessing a valve at tank farm

1-step aluminum stair makes accessing this low work platform (over 19 inches / 48 cm) OSHA compliant.

Custom ErectaStep (PerfectaStep System) access platform installation at a midstream facility in Gillett, TX

GX Gangway Installation at a LaFarge Holcim facility in New Orleans LA

C Series Mobile Cantilever Work Platform for Safe Elevated Access.

ISO Container with bottom loading arm, vehicle grounding, and SafeRack gangway with a safety cage for top access or venting – Chevron

ErectaStep Crossover Stair install with F1 Form Kit as an Easy to Install Footer

Access platform with pre-cast foundations for an energy company in Georgia.

SafeRack MAUI truck loading mobile access safety cage for Global General Motors.

YellowGate Safety Gates installed at an Industrial Facility

SafeRack GX Gangway installed at a chemical facility for bulk loading sulfuric acid

Custom Offset gangway installation for cement – Savannah, Georgia

MAXRack Truck Loading at Buckman Labs in Memphis, TN

MAXRack Truck Loading at Buckman Labs in Memphis, TN

MAXRack Truck Loading at Buckman Labs in Memphis, TN

ErectaStep crossover installation at an international gas facility.

ErectaStep catwalk crossover stair installation at a gas facility.

ErectaStep Industrial Stairs and YellowGate Installation

Lanxess Oleum Loading Terminal – MaxRack safety cage, platform & canopy installation

Custom stair work platform installation

ErectaStep Metal Stair Installation at Willliams Natural Gas Facility in New Jersey.

Custom access platform installed at tank farm Cape Canaveral FL

This Job Needed to Add a Step to be OSHA Compliant.

Tracking Gangway Installation in Kentucky for Safe and Efficient Truck Access.

This is a customized ErectaStep stair tower installation. With a height of 34′ feet, this stair tower is for contractors, maintenance staff, and researchers to frequently access the roof at an HVAC R&D facility in Atlanta. This installation also includes a jib off to the side to safely hoist tools and small equipment up to the roof.

Custom RollaStep platform used for servicing this 86,000 lb boiler at a facility in Plattsburgh, NY

This is an ErectaStep wellhead platform installation for access and valve maintenance at a PG&E facility in California.

This ErectaStep installation uses prefabricated ladder and platform components creating a unique access solution for this generator shed.

Diesel generator support and access platform

Installation for loading flatbed trucks using RollaStep mobile platforms.

The natural gas industry is abuzz over work platforms’ role in ensuring safety. No one likes a dangerous situation, after all! And while they might not look pretty, these platforms are essential to gaining access to shut-off valves and metering skid systems without risks of falling. After all, when it comes to natural gas production, the name of the game is safety first!

Shut-off valves are essential for natural gas installations because natural gas is a volatile substance that needs to be handled with extreme care. Shut-off valves help ensure the safe operation and shut down of natural gas systems during normal operations or emergencies, reducing the risk of accident and injuries.

YellowGate rooftop railing with round base installed on TPO membrane roof at US Foods – Twinsburg, OH

Railcar Access

SafeRack ATV Maui System 6X6 safety cage installation in La Porte, TX

Efficiently mastering elevation challenges without requiring custom fabrication: ErectaStep stairs installation at a renewable energy site in Brea, California

An ErectaStep Ship Ladder Installation at Apple’s Santa Clara Facility: A Perfect Blend of Functionality and Design

In a small community in the Northwest Territories of Canada, the installation of a G4 gangway and loading platform provides a safe and efficient solution for accessing the tops of trucks for water loading, even under challenging weather conditions.

An ErectaStep stair and access platform installation at Cla-Val’s test stand in Costa Mesa, CA, where its modular and versatile stair and platform system plays a crucial role.

ErectaStep Stairs replaces scaffolding for accessing valves at Arizona nitrogen facility

ErectaStep Stair Installation at Boise Fuel Terminal

Railcar loading terminal with SafeRack Gangway

Portable Transloader with a SafeRack G4 Gangway

In a project in New Mexico’s Permian Basin, a new tank storage facility needed several crossover steps and valve-access platforms as part of an installation. Customers’ individual site layouts and pipe/valve positions dictated the platform configurations used.